Case Study 94: 2017 Pavement Maintenance

Location:
Tumwater, WA
Date:
July, 2017
Product:
7,800 Tons of FORTA-FI® Reinforced Asphalt, 17,814 SY’s of RG1010 High Strength Paving Grid Interlayer.
Engineer:
Lakeside Industries
Contractor:
Lakeside Industries

Projects /
Your Reliable Partner to Success
Latest Projects
Call us
+86-25-88038265
Get Quote
PHONE
Tel: +86-25-8803 8265
Fax: +86-25-8373 8236


EMAIL
info@emgeosynthetics.com

ADDRESS
ADD: 36/F, SUNNYWORLD, NO.188 LUSHAN ROAD, NANJING 210019, JIANGSU, P.R.CHINA

OPEN HOURS
MON-FRI: 9:00 a.m.~ 6:00 p.m.
SAT: 10:00 a.m.~ 1:00 p.m.

©2019~2020 Earthmate Geosynthetics | All Rights Reserved